Amazing progress has occurred I have to say. The drywall is done and tomorrow, on day 36, they will prime it all up to prepare for painting. Also tomorrow, our flooring guy will drop off our oak flooring and plywood covering. Today we lined out tile design and nailed down how many square feet of each tile type will be required.